Planning centre
Specification texts, documents and project support in one place for architects, engineers and procurement teams planning a hospital.
Specification texts
Copy and adapt for your project
The clauses below are sample specifications based on Reanimed product features. Adapt them to your project, or ask us for a project-specific specification.
Medical gas outlets6 clauses
- Medical gas outlets shall comply with EN ISO 9170-1 and be CE marked.
- Outlets shall be to the standard specified for the project (DIN, BS or NF EN 737-1), with gas-specific indexing that physically prevents misconnection.
- Outlets shall be colour coded by gas.
- The outlet mechanism shall be corrosion-resistant brass with a durable ABS front cover.
- Outlets shall be compatible with bed head units, ICU units, pendants and wall modules.
- For surface installation, outlets shall be supplied in an ABS box with a clear protective cover.
Bed head units7 clauses
- The bed head unit shall be made from extruded aluminium and electrostatically powder coated in a RAL colour selected from the chart.
- The unit shall have one, two or three channels separating gas, power and low-voltage (data, nurse call) services.
- The unit shall contain the number and type of medical gas outlets, power sockets, equipotential earthing points and data sockets specified for the project.
- The unit shall include an accessory rail for medical accessories.
- The unit shall offer direct (reading/examination) and indirect (ambient) LED lighting.
- Electrical components shall comply with EN 60601-1 and EN 60601-1-2.
- The product shall be manufactured in an EN ISO 13485 certified facility and be CE marked.
ICU units6 clauses
- The ICU unit shall be ceiling-suspended bridge type, floor-to-ceiling column type or wall type, as specified for the project.
- Bridge and column units shall allow double-sided use and access to the bed from more than one side.
- The unit shall carry gas, power and data services in separate channels and have removable panels for service.
- The unit shall include a full-length accessory rail for shelves, monitor arms and infusion poles.
- The unit shall include direct and indirect LED lighting.
- Dimensions and outlet quantities shall be manufactured to project requirements.
Ceiling pendant systems5 clauses
- The pendant system shall be ceiling mounted and of fixed, single-arm, double-arm or tandem type as specified.
- On motorised models, console height shall be electrically adjustable.
- The console shall rotate; medical gas outlets, power and data sockets and accessories such as shelves, drawers and monitor arms shall be configured per project.
- On tandem types, gas and power services shall be in separate wet and dry columns.
- Mounting plate details shall be supplied by the manufacturer.
Area valve units5 clauses
- The area valve service unit shall include a separate shut-off valve and pressure gauge for each gas line.
- Each line shall have a pressure sensor for continuous monitoring, connectable to an alarm panel.
- The box shall be electrostatic powder-coated steel or AISI 304 stainless steel as specified.
- The box shall be flush or surface mounted.
- The box shall be configurable for 1 to 7 gas lines.
Manifold systems4 clauses
- The manifold shall control, regulate, monitor and distribute gas from cylinders or cylinder packs.
- The system shall have automatic changeover so that supply continues uninterrupted when one side is empty.
- A bypass line shall keep supply running during maintenance.
- The system shall be modular and compatible with all medical and mixed gases.
Medical air plants (MEDAIR)4 clauses
- The medical air plant shall comply with EN ISO 7396-1.
- The plant shall consist of compressors, air receiver, dryer, filter set and pressure regulation.
- Compressors shall be oil-free scroll or oil-injected screw type in duplex, triplex or quadruplex arrangement as specified.
- The controller shall balance running hours and bring in a standby unit on failure.
Medical vacuum plants (MEDVAC)4 clauses
- The medical vacuum plant shall comply with EN ISO 7396-1.
- The plant shall use air-cooled, oil-lubricated rotary vane vacuum pumps.
- Pumps shall have integrated oil mist separation and oil filtration.
- The plant shall be duplex, triplex or quadruplex, vertical or tank-mounted, with intelligent pump management.
Anaesthetic gas scavenging (AGSS)4 clauses
- The AGSS shall comply with EN ISO 7396-2.
- The system shall use oil-free, air-cooled side channel blowers.
- In a duty/standby arrangement, the standby blower shall start automatically if the duty blower fails.
- Blower capacity shall be selected from 80, 140, 210 or 270 m³/h to suit the project.
Wall modules3 clauses
- The wall module shall have an aluminium or stainless steel body, flush or surface mounted as specified.
- The module shall house medical gas outlets in DIN, BS or NF standard, power sockets and data connections.
- Service access shall be from the front panel.
Project process
Six steps from survey to commissioning
- 01Survey and needs analysis
Architectural drawings and a site visit establish the current situation and requirements.
- 02Design and proposal
A detailed proposal with layout, product configuration and capacity calculation.
- 03Production
Products are made and tested for the project in our facility in Gebze.
- 04Installation
Our technical team installs and connects everything on site.
- 05Testing and commissioning
Pressure, leak and function tests, then the system goes live.
- 06Training and service
User training, then ongoing maintenance and spare parts support.

